Soap Making Process in Nigeria


Category: Business & Consultancy Services

Employment of any form today either in the private or public sector has become a nightmare. It is no longer important whether you have an uncle as “oga at the top”. Is it not when there is available vacancy that the uncle can provide you with a job? Even the uncle is now afraid of losing his own job. And doing everything possible to protect the job; and have a Plan B!

This is why everyone, including government and private sectors are preaching, “SME”- Small and Medium Enterprises.


On ACKCITY, we continually enlighten, teach and give necessary information to our readers that can help them to start their own business.

We have written on How to start your Supermarket Business, Pure Water Business Set Up, Fish Farming, Online Business, and many others.

The subject this time is, Soap Making.

Soap making takes three stages; mixing, cutting and packaging.

In starting your Soap Business, here the list of major important things you MUST put into consideration before starting;

Soap Making Factory Layout:

Location:

You factory should be large enough to occupy five rooms divided into (Cloak room, Packaging material room, Packaging material store, Production room, and finished product room

Mixing Stage:

Two- Stainless Mixer (500 liters)

Treatment Plant (20 inches)

Deionizer

Power pump (Stainless or metal) (1HP)

Two- Tanks (3000 Liters)

Water analysis

Chemical to treat

Pipe and fittings

Cutting Stage:

Mould & Molding machine (It can be manual or automatic). You can start your factory with a manual and switch to automatic later- this handled by one person

Cutting machine (It can also be manual or automatic) - handled by one person

Packaging Stage:

Three phase packaging machine is used in packaging of soaps after cutting

Power

Generator; use at least a 100 KVA generator

Regulatory Requirements

1. License (CAC)

2. NAFDAC: Requirements for production inspection of premises for regulated food, water and cosmetics;

Arrange three (3) photocopies of required documents below and present the original for sighting:

1. Application letter (On Company’s letter-headed paper) addressed to:

The Director, Establishment Inspection Directorate, NAFDAC, Abuja

2. Labeling: The label of the packaging materials should be in the following pattern:

Name of product/pack size (Top portion), Batch No., Manufacturing Date, Best Before, NAFDAC Reg. No, List of Ingredients (Except water), Factory location address (Not P.O.Box)

3. Evidence of payment

4. Certificate of Incorporation of Company (Obtained from CAC)

5. Evidence of Trade Mark Reg. (Obtained from Federal Ministry of Commerce & Industry)

6. Organogram of the company with names and qualifications of key officers (e.g. MD, Production Manager, Quality Control Manager)

7. Letter of Appointment and Acceptance of key Officers

8. Standard operating procedure (SOP) for production

9. Standard Operating procedure for Quality Control

10. Standard operating procedure for Cleaning of Factory Premises and Equipments

11. Standard operating procedure (SOP) Recall and Distribution Channels

12. List of production facilities/ quality control with their sources of purchase

13. Batch formulation (Not applicable for packaged water)

14. Retainership agreement with a hospital or clinic (with names and signature of both parties)

15. Food Handlers Test/Medical Fitness Tests which should include;

· Sputum test

· Urine test

· Stool test

· Chest x-ray

· Widal test

16. Analysis of raw materials and finished product

17. Agreement with fumigation company for regular fumigation of the factory with name and signature of both parties

18. Current fumigation certificate of factory (quarterly)

19. Geological survey of borehole report

20. Any other relevant documents

Financial Requirement for running your factory

Location Cost

1- Factory Site: N500,000 and above, depending on your location

Mixing Stage

2- Treatment Plants(16in to 20in): N200,000

3- Two- Tanks (3000 Liters): N100,000 each

4- Deionizer: N50,000

5- Pumps (Stainless): N25,000, Metal: N20,000

6- Micro filters(3 Sets): N25,000 each

7- Two sets- Stainless Mixers (500 liters): N300,000 each

8- Water analysis: N20,000

9- Pipe & Fittings (Negotiable and depending on the size of factory)

Cutting Stage

10- Mould for tablet soap: N170,000

11- Molding machine (Manual): N75,000, Automatic: N200,000

12- Cutting machine (Manual): N120,000, Automatic: N200,000



Packaging

Packaging machine (Three phase packaging machine): N2 million

Regulatory:

NAFDAC: N450,000 (Four hundred and fifty thousand naira)

Generating Set: N500,000

Marketing

Website/ Online Marketing: ?

Advertising/ Marketing:?

You may check advertising options here:

Total: N5,000,000 (Five million naira)

Staffing

One- Production Manager,

Three- (Tablet) Factory workers,

Three- (Liquid) Factory workers.

One free worker to run around

Cleaning is usually alternated among the factory workers.

Your Factory Site

For more information, please contact admin@akcity.net

Related Posts via Categories:

This article is published under Business & Consultancy Services
Send stories for publishing to admin@ackcity.net
Be Our Fan On Facebook
Follow Us @ACKCITY On Twitter
Want updates via;
BB: 7ABCA2A7
WhatsApp: (234) 08105649346
Advertise your products & services;
Call: (234) 08105649346, 08121807240
E-mail: admin@ackcity.net
Leave your comment(s) below:

No comments

Powered by Blogger.