NAFDAC Registration Requirements


NAFDAC Approval: Please visit a NAFDAC office to obtain and fill the relevant forms. The process will take you as much as three months and up to six months before you get the certified.
 

Please note that you are not allowed to produce or sell until your production is approved

NAFDAC Approval is noted to be the most difficult of it all and take much time. 
NAFDAC will not approve factories located in

·         Waste dumpsite
·         Toxic dumpsites
·         Cemetery
·         Non demarcated flats in the same building where people are residing
·         Oil pipeline ways
·         Inside open public markets
·         Sewage centers
·         Public park
Cost of Obtaining NAFDAC Certificate
Note that you need a Registered NAFDAC Consultant to able to obtain your NAFDAC Number. It is your NAFDAC consultant that relates with the NAFDAC Authorities in making payment for forms, inspection of site, borehole water approval and certification.
To get the cost of NAFDAC approval/certificate and consultancy fees to obtain your NAFDAC certificate for your pure water factory, please contact us through phone/whatsapp; (234)08105649346 or E-mail: ackcity@gmail.com

One of the requirements needed by NAFDAC as part of your approval process is; Business registration certificate with CAC and a Trademark, which can both be obtained within two weeks because of legal search and collection of certificate from Abuja office of CAC. 
Please note in your planning to ensure that NAFDAC does not condemn your factory during inspection because you will be required to fix anything that is noticed not to be in place and they will keep coming back, which may cost you more money at the long run and cause delay of production or even a temporary seal up of your factory. 
 
NAFDAC Requirments
 
1. Business registration
2. Trademark registration
3.Fumigation of premises
4. Medical certificate of fitness: (for all the staffs)
a. Sputum test
b. Urine test
c. Stool test
d. Chest x-ray
e. Widal test
5. Retainership Agreement with hospital
6.Retainership Agreement with public analyst
7. Company letter head paper
8. Inspection materials:
a. Rubber sandals
b. White overall
c. Head gear
d. Hand glove
e. Nose and mouth protector
f. First aid box (duly equipped)

Category: Pure Water Consultancy Services

Other Posts in This Category

Pure Water Production Business Guide/Plan

Pure Water Factory Set up (Pictures)

No comments

Powered by Blogger.